From The Narrative Company
Narrative Legacy Commission™
Architecture for what must endure
Give a life, archive or body of work the architecture it needs to endure.
Begin with the subject, existing archive, intended audience and rights already in place. Scope comes before production.
Legacy commission
Strategy before production.
From $4,500 · multimedia from $12,500 + costs
Choose the pathway
Strategy determines what production should become.
Strategy & Archive Direction
From $4,500
Story architecture, archive direction, rights and boundary decisions, intended audience, recommended form and the roadmap required before production.
Production is not included.
Produced Multimedia
Generally from $12,500 + hard costs
A separately scoped short film, documentary, multimedia archive or public record developed after strategy and rights review. Crew, travel, locations, archive licensing and other hard costs remain separate.
The inquiry identifies the likely pathway; the written scope confirms the form, rights, labor, production plan and investment before work begins.
Before we speak
Name what must endure—and who currently holds it.
Legacy work can be private, institutional or public. This inquiry helps us understand the archive, rights, intended audience, form and funding path before any production is proposed.
What happens next: Submit this focused inquiry. We’ll review the context, scope and timing, then respond with the most appropriate next step.
Your answers are used only to assess fit and prepare the conversation. Submitting an inquiry does not create an engagement or guarantee availability.